Gross Leak Pressure-Hold Leak Detection
Place the workpiece into the vacuum chamber and complete the sealing process. Press the start button once, and the chamber door will close automatically. Valve V3 opens while all other valves remain closed. The vacuum chamber is pre-evacuated first. After the chamber reaches the preset vacuum level, the workpiece enters a pressure-holding stage for several seconds.
If no gross leak is present, the pressure remains stable, and the system continues evacuating both the chamber and the workpiece to the target vacuum level.
If the pressure cannot be maintained within the preset time, the system determines that a gross leak exists in the workpiece and automatically triggers an audible and visual alarm. The system must then be stopped, the reset button pressed, and the workpiece removed after opening the chamber door.